江苏金洋机械有限公司
Your current location : Home >>News >> Industry information

Introduction of rail first aid

2018-07-21
times

·Reinforce the welding strips that are judged as various damages on the line.
·First aid reinforcement should be carried out when the rail or welding strip is broken.
·Aluminum heat welding, air pressure welding, and resistance welding belt damage can be firmly clamped. Injuries between or on sleepers
·The damaged rail can be clamped. Made of alloy steel precision casting, beautiful in appearance and light in weight: 18kg,
·Easy to carry, impact resistance and long service life.
·A spare set at the bottom of each kilometer standard and half kilometer standard track, which is very timely and convenient to use



tags

url:

Browse:

product

news

  • Home
  • Tel
  • Top